Posted in | News | Copper | Mining Business

Excelsior Begins Hydrological Drilling Program at Arizona Gunnison Copper Project

Excelsior Mining Corp. ("Excelsior" or the "Company") is pleased to announce that its hydrological drilling program has commenced at the Gunnison Copper Project in Arizona.

The primary component of the hydrological program will comprise 26 hydrology test wells totalling approximately 28,000 feet. Extensive geophysical logging and long term pump tests will be conducted on all holes with the objective of characterizing aquifer properties and the variations that control the movement of fluids through the mineralized bedrock. Because hydraulic conductivity, effective porosity, and aquifer continuity are critical in the mining process, the investigations of potential conduits or barriers to groundwater flow will prove invaluable to the ultimate design and success of the production well field. Results will be used to construct a numerical groundwater flow and transport model to simulate the planned in-situ recovery operations, and to demonstrate hydraulic control during operations. Additional long-term aquifer testing will also be conducted on previously constructed wells.

Hydrological data and modeling will be used for both the permitting application process and the feasibility study. All drilling, data interpretation, and modeling are expected to be completed in Q2 2015.

Commenting on the hydrological program, Stephen Twyerould, President & CEO, stated, "The economic advantages of the Gunnison Project are based largely upon the hydrology elements that define the project. The results of the hydrological program will represent the largest and perhaps the most important component of our feasibility study. We look forward to reaffirming that the conditions at Gunnison are optimal for safe and effective in-situ recovery copper mining."

About Excelsior

Excelsior is a mineral exploration and development company that is advancing the Gunnison Copper Project. The Excelsior management team consists of experienced professionals with proven track records of advancing mining projects into production. Further information about the Gunnison Copper Project can be found in the technical report filed on SEDAR at www.sedar.com entitled: "Gunnison Copper Project, NI 43-101 Technical Report, Prefeasibility Study" dated February 14, 2014.

Dr. Stephen Twyerould, Fellow of AUSIMM, President and CEO of Excelsior, and a Qualified Person as defined by NI 43-101, has reviewed and approved the technical information disclosed in this news release.

For more information on Excelsior, please visit our website at www.excelsiormining.com.

ON BEHALF OF THE EXCELSIOR BOARD

Mark J. Morabito, Executive Chairman

Source: http://www.excelsiormining.com/

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.