Posted in | News | Lithium | Mining Business

Pure Energy Provides Update on Various Activities at Lithium Projects in Clayton Valley, Nevada

Pure Energy Minerals Limited is pleased to provide an update on various activities on its lithium projects in Clayton Valley, Nevada.  As outlined below, the Pure Energy and Tenova Bateman Technologies (TBT) team have passed several fundamental milestones on the innovative process engineering work for the Clayton Valley South (CVS) lithium brine project.  These are important steps towards the delivery of a Preliminary Economic Assessment (PEA), slated for the fourth quarter of this year.

It is also a busy time in the field as activity increased on the CVS Project and on the adjacent claims recently optioned from Cypress Development Corporation (the “Cypress Project”). Recent highlights and activities include the following:

  • Tenova Bateman Technologies (TBT) has concluded the CVS Project Mini-Pilot Plant trials at its facility in Katzrin, Israel;
  • The Mini-Pilot Plant program encompassed successful vetting, preliminary optimization, and execution of the three stages of the TBT lithium process: the brine pretreatment (LiP™), solvent extraction (LiSX™), and electrolysis (LiEL™);
  • The program culminated with the successful demonstration of crystallization of high-purity, battery-grade lithium hydroxide monohydrate from a synthetic electrolysis product liquor;
  • Field crews and consultants have mobilized to the Cypress Project to commence a systematic sampling and mapping program.

Patrick Highsmith, Pure Energy Minerals CEO commented on the Company’s recent activity, “We are excited to see the TBT Mini-Pilot Plant wind down with such strong preliminary indications of success.  The engineering reviews among our owner’s team and key independent service providers have resulted in a consensus opinion that we are on track in all the major categories of the process engineering work.  It is important to highlight the near-seamless collaboration across this diverse team.  It is uncommon to see a team focused consistently on results without regard to agenda or bias.  We are receiving preliminary technical findings and incorporating them into preliminary design work and cost estimation that will form the foundation of our PEA.”

CVS PROJECT ENGINEERING WORK

The TBT Mini-Pilot Plant study of the CVS brines concluded recently.  TBT and Pure Energy’s consulting engineers report that each phase of the test work yielded a successful outcome.  Brine pre-treatment (LiP™) testing exceeded expectations for lithium recovery and rejection of magnesium and calcium, and a final membrane has been selected for some additional testing work, and likely use in the next phase of testing, a pilot plant to be operated as part of the feasibility study.

Very positive results were obtained for the concentration of lithium from the brine by solvent extraction (SX).  Likely operating conditions during the LiSX™ stage were determined (e.g. operating pH, flux rates and brine:extractant ratios).  TBT’s favoured extractant has demonstrated highly efficient lithium recovery (close to 100% in the SX circuit), leaving very low levels of lithium in the barren brine which is destined for re-injection into the wellfield.

As reported previously (see Company news release dated August 9, 2016), the electrolysis component of the process (LiEL™) also yielded good results and generated important parameters for input to the preliminary design and cost estimation steps that follow.

Among the final steps from the Mini-Pilot Plant was confirming that a service provider had crystallized high-purity lithium hydroxide monohydrate through conventional evaporative crystallization.  Preliminary results demonstrated that crystallization operating conditions were successfully determined and that recovery of lithium hydroxide monohydrate was efficient, and produced “battery-grade” material.

The scheduled work for the CVS Mini-Pilot Plant program is now complete, and draft results are flowing into the Pure Energy technical team from TBT, SGS Canada Inc., and other providers.  These data and other engineering work will allow the team to provide a complete description of the process flowsheet and an integrated “well-to-product” costing estimate.  This will form the bulk of the Company’s forthcoming PEA.  Some additional test work will follow as TBT and other consultants make recommendations for additional work beyond the PEA.

Dr. Ron Molnar, Professional Metallurgical Engineer (Ontario P.E.# 100111288), is a qualified person as defined by NI 43-101, and has reviewed and approved the scientific and technical information that forms the basis for the process engineering components of this news release. Dr. Molnar is independent of the Company.

CYPRESS PROJECT – EARN-IN JOINT VENTURE WITH CYPRESS DEVELOPMENT CORP.

The Pure Energy and Cypress teams have launched a systematic sampling and mapping program on the 1,520-acre Cypress Project, which adjoins the CVS Project on the east.  The sampling will consist of approximately 500 rock and colluvium samples on a nominal 100-metre grid.  The sampling program is designed to augment and compliment previous Cypress sampling that outlined a mineralized zone at surface, averaging approximately 1,350 ppm Li in a sequence of volcaniclastic and lacustrine sediments.

The systematic sampling is intended to provide greater context for the large area of high lithium in these rocks.  Combined with mapping, these data will give the team a better idea of true thickness and potential volumes of the lithium-rich rocks.  The geologists are sending the samples to ALS Laboratories in Reno, Nevada for analysis by a rigorous multi-element geochemical package that includes lithium and other key elements.

Pure Energy is funding this program as part of its earn-in agreement on the Cypress Project, which includes a first-year investment of US $300,000 in exploration and development activities.

Patrick Highsmith, Certified Professional Geologist (AIPG CPG # 11702), is a qualified person as defined by NI 43-101, and has supervised the preparation of the scientific and technical information that forms the basis for the Cypress Project portion of this news release.  Mr. Highsmith is not independent of the Company as he is an officer and director.

Source: http://www.pureenergyminerals.com/

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.