Posted in | News | Copper

Puma Exploration Announces First Hole Drill Results from Turgeon Copper Project

Puma Exploration (TSX VENTURE:PUM) has reported the results from the first hole drilled in 2010 at the Turgeon Copper Project, New Brunswick.

The hole T10- 01 intersected three mineralized copper zones from which the first two grade more than 1% Cu over 68.0 metres and 20.3 metres respectively. The third zone is characterized by disseminated copper mineralization grading 0.24% Cu over 23.6 metres.

Main mineralized zones intersected in hole T10-01 (N240/-49)

Zone A (29-97m)

The zone A corresponds to the Power line showing which outcropping at surface. The mineralization comes in form of thick chalcopyrite stockwerk. The core of the mineralized zone is characterized by a significant copper enrichment grading 2.44% Cu over 26 metres.

Zone B (161-182m)

The zone B corresponds to the 100m Zinc Zone defined by Esso Minerals exploration works. It's consisted of several massives sulfides intervals varying from 2 to 5 metres spaced out by disseminated copper mineralization. Include in the copper mineralization of more than 1% Cu over 20.3 metres, this zone contains a zinc enrichment grading 2.4% Zn over 20.3 metres as well as precious metals enrichment.

Zone C (223-247m)

This zone corresponds to the 48-49 Zone defined by Esso Minerals. The previous holes E82-48 and E82-49 by Esso had intersected this zone that at about 75 metres east of hole T10-01 with 2.1% Cu over 24.2 metres and 2.1% Cu over 19.1 metres. In hole T10-01, the mineralization comes in form of disseminated copper grading 0.24% copper Cu over 23.6 metres. The interpretation of the borehole geophysical survey done in hole T10-01 should allow to specify relation between the zone cut and the ones in the previous drilling.

Precious metals

Besides intercepting copper and zinc mineralization, hole T10 confirms silver enrichment of some massives sulfides veins. Silver intersections grading more than one ounce, such as 41.4 g/t Ag over 2.6 metres and 31.1 g/t Ag over 2.2 metres have been cut for the first time in drilling. It is to note that the majority of the previous holes were not analysed for precious metals.

The hole reached the depth planned of 594 metres and at 303.8 metres the hole cut a mineralized fault zone grading 1% Cu over 3.7 metres. Further to this fault zone, the hole got into an important sequence of mafic dykes cross-cutting almost entirely the host rock of the mineralization.

In the light of the results of hole T10-01, the drilling program will resume immediately after the final interpretation of the geophysical survey. Exploration works should start at the beginning of December 2010.

About Turgeon

The Turgeon property is located only five kilometres south of the deepwater port of Belledune and 25 kilometers north of Bathurst, New Brunswick. The property is accessible by road all year round and is intersected by a power line. The total current area of the property is 24.5 km2 (2,450 hectares).

The contents of this press release were prepared by Marcel Robillard, a Qualified Person as defined in NI 43-101. The samples were analyzed at the ALS Chemex laboratory in Val d'Or using the atomic absorption and ICP methods.

Source: Puma Exploration

Citations

Please use one of the following formats to cite this article in your essay, paper or report:

  • APA

    Puma Exploration Inc.. (2019, February 18). Puma Exploration Announces First Hole Drill Results from Turgeon Copper Project. AZoMining. Retrieved on April 28, 2024 from https://www.azomining.com/News.aspx?newsID=1634.

  • MLA

    Puma Exploration Inc.. "Puma Exploration Announces First Hole Drill Results from Turgeon Copper Project". AZoMining. 28 April 2024. <https://www.azomining.com/News.aspx?newsID=1634>.

  • Chicago

    Puma Exploration Inc.. "Puma Exploration Announces First Hole Drill Results from Turgeon Copper Project". AZoMining. https://www.azomining.com/News.aspx?newsID=1634. (accessed April 28, 2024).

  • Harvard

    Puma Exploration Inc.. 2019. Puma Exploration Announces First Hole Drill Results from Turgeon Copper Project. AZoMining, viewed 28 April 2024, https://www.azomining.com/News.aspx?newsID=1634.

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.