Posted in | Gold

Lydian International Begins Planned 30,000m Drilling at Amulsar Gold Project

Lydian International has begun the proposed 30,000 meter drill program at its Amulsar gold project. In 2006, geologists from Lydian had identified Amulsar gold project as having a high-sulfidation style.

The company intersects 1.1 g/t gold over 32.4 Mt as Indicated Category resources and 0.9 g/t gold over 48.3 Mt as Inferred Category resources.

The first exploration holes have been located to aim the surface soil and rock chip anomalies, which is situated around 1 kilometer south west of the existing resource casing at Amulsar. The company has discovered gold anomalism region that covers around 9 km2 through former scout drilling and surface geochemical sampling. The present resource area contains around one third of this region. It means that the major additional resource potential is to be analyzed away but in the instant locality. The main objective of this drilling campaign is to examine the potential regions and to find out recent resource ounces.

Also, this drilling will intend to target high-grade gold mineralization additionally from inside and regions of resource expansion next to the Amulsar’s recent resource shell and to transform current Inferred resource ounces to Indicated category.

Source: http://www.lydianresources.com/

Joel Scanlon

Written by

Joel Scanlon

Joel, originally from the UK, emigrated to Australia in 1995 and spent 5 years working in the mining industry as an exploration Geo-technician where he developed skills in GIS Mapping and CAD. Joel also spent a year working underground in a gold/copper mine. Upon moving to the North Coast of NSW, Australia Joel worked as a graphic designer for a leading consultancy firm before starting a successful business providing graphic and web design services to local businesses on the eastern seaboard of Australia. Joel is skilled in project management, web programming, design, animation, database and networking, software and editing. Joel has been with AZoNetwork since its inception in 2000.

Citations

Please use one of the following formats to cite this article in your essay, paper or report:

  • APA

    Lydian International Ltd.. (2019, February 18). Lydian International Begins Planned 30,000m Drilling at Amulsar Gold Project. AZoMining. Retrieved on September 17, 2019 from https://www.azomining.com/News.aspx?newsID=4072.

  • MLA

    Lydian International Ltd.. "Lydian International Begins Planned 30,000m Drilling at Amulsar Gold Project". AZoMining. 17 September 2019. <https://www.azomining.com/News.aspx?newsID=4072>.

  • Chicago

    Lydian International Ltd.. "Lydian International Begins Planned 30,000m Drilling at Amulsar Gold Project". AZoMining. https://www.azomining.com/News.aspx?newsID=4072. (accessed September 17, 2019).

  • Harvard

    Lydian International Ltd.. 2019. Lydian International Begins Planned 30,000m Drilling at Amulsar Gold Project. AZoMining, viewed 17 September 2019, https://www.azomining.com/News.aspx?newsID=4072.

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Submit