Posted in | News | Gold

Kilo Goldmines Reports Seventeenth Drill Hole Results from Somituri Project, DRC

Kilo Goldmines Ltd. (TSX VENTURE:KGL)(FRANKFURT:02K) has announced results from diamond drill hole seventeen on the Company's Somituri Project in north-eastern Democratic Republic of Congo.

Somituri - Adumbi Prospect Drilling

Diamond drill-hole SADD0017 was collared on drill section 19835E to intersect the main zone gold bearing structure vertically below the previously reported gold bearing zone intersected in drill hole SADD0004 on drill section 19850E (see July 9, 2010 press release). Drill hole SADD0017 was drilled on a magnetic azimuth of 220 degrees at an inclination of -50 degrees to 379.70 metres.

Diamond drill hole SADD0017 intersected the hangingwall tuffaceous metasedimentary rocks, followed down-hole by the chemical metasedimentary rocks predominantly characterized by intervals of chert, chert banded with magnetite iron formation (BIF), as well as minor intervals of chert banded with black shale and several narrow intervals of black shale; quartz veins occur throughout the chemical metasedimentary rocks. The drill hole ended in the footwall tuffaceous metasedimentary rocks and greywacke.

As previously reported (see December 12, 2010 press release), diamond drill holes SADD0015 and SADD0016, also collared on section 19835E, intersected oxidized mineralization hosted in the sub-vertical chemical metasedimentary rocks predominantly characterized by intervals of chert, chert banded with haematite iron formation (BIF), as well as minor intervals of chert banded with black shale and several narrow intervals of black shale.

"The results of drill hole SADD0017 demonstrate excellent vertical continuation of the footwall or Main Zone gold mineralization over a substantial width," stated Peter Hooper, Executive Chairman of Kilo.

Summary of 2010 Exploration on the Somituri Project

Company geologists arrived at the isolated project site in the Ituri rainforest by helicopter in late January 2010, and four weeks later diamond drilling of the Adumbi Prospect commenced. By year- end 2010 Kilo had completed 9,745.6 metres of diamond drilling, 592.5 metres of adit sampling, 733.65 metres of trenching, and collected 1,233 soil samples (includes QC samples). The drill core has been logged and sampled; assay results for several thousand drill core, trench and soil samples are pending and will be released as they are received.

The company explored a 2,058 metre strike length of the Adumbi Prospect with 31 drill holes (including 6 re-drilled abandoned holes) on 17 section lines. Records from the colonial era, unverified by the Company, indicate that during the 1940s until its closure in 1958 the combined production from the Adumbi and Bagbaie (about 1 kilometre northwest of Adumbi) mines totaled about 200,000 ounces of gold; the gold exploited from the Adumbi mine was hosted in quartz vein ore that reportedly averaged 11 g/t gold.

In addition, five drill holes explored a 960 metre strike length of the past producing Kitenge gold mine, three holes tested a 1,360 metre strike length of the former Manzako gold mine and one drill hole targeted the Monde Arabe artisanal workings, which may be the northwest strike extension of the Kitenge gold bearing structure. According to historical records, unverified by the Company, the Kitenge and Manzako mines produced about 100,000 ounces of gold prior to about 1942.

Simultaneously with the exploration program a fully functional exploration camp with a number of permanent brick buildings was constructed on site during 2010. The Kilo bulldozer has built a 7 kilometre road from the Adumbi camp to Village 47 on the Niania to Isiro road; a State construction crew has advanced this road northerly to within 10 kilometres of Village 47. Kilo anticipates having road access to the Adumbi camp in early 2011.

QC and Analytical Procedures

Quality control of analytical results is monitored by the company with the insertion of commercial standards and blanks in every batch of samples submitted for analysis. For additional details the reader is referred to Kilo's previously announced (see May 4, 2010 press release) quality control and analytical procedures.

Source: Kilo Goldmines Ltd.

Citations

Please use one of the following formats to cite this article in your essay, paper or report:

  • APA

    Kilo Goldmines Ltd.. (2019, February 18). Kilo Goldmines Reports Seventeenth Drill Hole Results from Somituri Project, DRC. AZoMining. Retrieved on April 24, 2024 from https://www.azomining.com/News.aspx?newsID=2362.

  • MLA

    Kilo Goldmines Ltd.. "Kilo Goldmines Reports Seventeenth Drill Hole Results from Somituri Project, DRC". AZoMining. 24 April 2024. <https://www.azomining.com/News.aspx?newsID=2362>.

  • Chicago

    Kilo Goldmines Ltd.. "Kilo Goldmines Reports Seventeenth Drill Hole Results from Somituri Project, DRC". AZoMining. https://www.azomining.com/News.aspx?newsID=2362. (accessed April 24, 2024).

  • Harvard

    Kilo Goldmines Ltd.. 2019. Kilo Goldmines Reports Seventeenth Drill Hole Results from Somituri Project, DRC. AZoMining, viewed 24 April 2024, https://www.azomining.com/News.aspx?newsID=2362.

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.