Posted in | News | Gold

ITEC Reports First Metallurgical Study Results from WPE Project in Arizona

Intertech Solutions Inc. ("Intertech Solutions Inc.," "ITEC" or the "Company") today is very pleased to report that the Company has received the first results from its metallurgical study, being implemented as part of the recommendations of the recently announced technical report on the WPE Project in Arizona.

The ongoing metallurgical studies involve the processing and analysis of two 1,000 pound bulk samples sent to two separate facilities for gold analysis. The studies involve gold characterization and liberation analysis with the objective of the work being to characterize the gold occurrences within the sample in terms of specific mineral associations and liberation size.

The results of the first round of testing are that gold was recovered from various fractions of the ore having an overall grade of 5.733 grams per ton (0.170 ounces per ton). This grade is significant as it falls directly between our Phase 2 program results of 4.556 grams per ton (0.135 opt) cut to one ounce, and 9.974 grams per ton (0.296 opt) uncut. The Company is now confident that the expected overall final grade of the deposit will fall somewhere in this range and that a minimum 5 gram per ton deposit is present.

The results to date based on the inferred mineral resource calculated under the classification of N.I. 43-101 of 2,437,500 tons, represent 414,375 inferred ounces.

We have also begun to receive results from the second metallurgical test, being undertaken by a Denver based testing facility. The ore processing, screening and separation analysis has shown that the gold is easily recovered from simple gravity separation, and that we can expect over 90% of the gold to be recovered in this fashion. Both the coarse and fine gold are thus recoverable by the processing method envisioned by the Company's technical group and that it has validated the plant design which will ensure a low cost, high net profit return of the operation.

Intertech is also now projecting, based on 500 ton per day operating tonnage, that 2,550 ounces a month may be produced at a value of $220 per ton costing $30 per ton to produce or $190 per ton net profit. If this is achieved, a monthly gross margin of $2,700,000 is possible.

We expect further results from the ongoing studies and will announce the results as soon as they are available.

The WPE Claims #1-#4 claims are located in the Middlecamp Mining District in La Paz County, near Quartzite Arizona. The gold claims cover a total of 80 contiguous acres and have easy access between Phoenix and Palm Springs, CA along Interstate 10.

About Intertech Solutions Inc. (OTCPK: ITEC)

Intertech Solutions is a fully integrated, gold project finance, management and services consulting Company that provides development capital, engineering, project supervision and technical management to gold projects. The Company operates from its offices in Scottsdale, Arizona. Visit us at: www.itecgold.com.

Source: http://www.itecgold.com/

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.