Posted in | News | Gold | Mining Business

Pretivm Presents Underground Infill Drill Program Results from Brucejack Project's Valley of the Kings

Pretium Resources Inc. ("Pretivm" or the "Company") is pleased to report a ninth set of results from the underground infill drill program at the Brucejack Project's Valley of the Kings. Results continue to confirm the style and grade distribution of the Valley of the Kings gold mineralization in the area currently being tested, which includes the intersection of high grade and visible gold.

Reported assays include three intersections grading greater than 1,000 grams per tonne gold, including the bonanza-grade intercept in hole VU-722 which encountered 37,117 grams per tonne gold uncut over 0.5 meters, the second highest grading intercept encountered to date at the Project. The highest-grading intercept was from surface hole SU-452 which intersected 41,582 grams per tonne gold uncut over 0.5 meters in 2012. (See Table 1 below for assays.)

Selected drill highlights include:

  • Hole VU-722 intersected 1,161 grams of gold per tonne uncut over 16.0 meters, including 37,117 grams of gold per tonne uncut over 0.50 meters;
  • Hole VU-715 intersected 46.08 grams of gold per tonne uncut over 23.29 meters, including 2,100 grams of gold per tonne uncut over 0.50 meters; and,
  • Hole VU-698 intersected 29.67 grams of gold per tonne uncut over 40.0 meters, including 1,850 grams of gold per tonne uncut over 0.50 meters.

Holes VU-722 and hole VU-698 were drilled from the 1270-meter drill bay while hole VU-715 was drilled from the 1350-meter drill bay. To date results from 306 holes (53,685 meters) have been reported.

For a plan and section views of the reported drill fans please see the following link: http://media3.marketwire.com/docs/1054538_Figure.pdf.

The 2015/2016 infill drill program is designed to target stope areas in years one through three of the current mine plan for the Valley of the Kings. The infill drill program is now complete and the final assays are currently being processed. Roughly 200 vertical meters over a strike length of 250 meters has been drilled at 7.5 to 10-meter centers. Assay results from drilling will continue to be reported as they are received.

Table 1: Selected Valley of the Kings Drill Results, May 2016 (VU-666 to VU-739)(1,2,3)

Hole
No.
Dip/
Azimuth
From
(meters)
To
(meters)
Interval
(meters)
Gold
(g/t)
Silver
(g/t)

Comments
1270 m Drill Bay - 426,663E/6,258,075N - 165 Azimuth
VU-666 -30/165 137.19 137.69 0.50 15.80 6.1
VU-676 -25/165 91.01 91.51 0.50 17.10 9.20
98.26 98.76 0.50 30.60 22.70
116.00 140.00 24.00 8.32 8.39
incl 120.03 120.53 0.50 209.00 168.00
incl 139.00 140.00 1.00 55.10 31.70
198.00 199.00 1.00 40.80 36.80
VU-683 -20/165 110.00 111.00 1.00 25.00 15.10
VU-688 -15/165 140.49 140.99 0.50 19.40 19.50
150.45 150.95 0.50 41.40 30.50
VU-694 -10/165 99.96 137.00 37.04 10.34 23.04
incl 99.96 100.46 0.50 248.00 73.70
incl 124.88 125.40 0.52 324.00 228.00
incl 136.00 137.00 1.00 19.30 23.60
VU-698 -5/165 93.00 133.00 40.00 13.30 23.16 1 sample cut
or 93.00 133.00 40.00 29.67 23.16 uncut
incl 110.48 110.98 0.50 1,850.00 549.00
incl 119.00 119.60 0.60 23.20 27.60
incl 119.60 120.10 0.50 16.50 16.20
incl 123.63 124.13 0.50 325.00 244.00
VU-713 27.5/165 82.00 89.40 7.40 12.67 124.37
1350 m Drill Bay - 426,706E/6,258,050N - 130 Azimuth
VU-686 -23/130 112.00 113.00 1.00 10.10 16.20
157.10 158.23 1.13 14.35 807.00
VU-690 -13.5/130 79.00 94.00 15.00 6.32 7.96
incl 79.00 80.00 1.00 17.10 21.30
incl 80.00 81.00 1.00 64.90 44.20
VU-695 -4/130 71.00 72.00 1.00 19.60 36.80
160.00 162.40 2.40 19.64 147.97
incl 161.20 161.70 0.50 52.50 375.00
incl 161.70 162.40 0.70 21.30 169.00
VU-700 5.5/130 108.00 118.00 10.00 7.74 49.56
incl 108.00 109.00 1.00 18.80 26.90
incl 114.94 115.44 0.50 40.40 34.50
incl 117.20 118.00 0.80 29.30 35.60
VU-704 15/130 50.00 51.00 1.00 8.79 11.50
97.00 98.00 1.00 8.64 23.50
137.45 137.95 0.50 13.00 701.00
VU-707 24.5/130 54.00 55.00 1.00 6.36 98.10
81.00 82.00 1.00 8.42 43.60
1260 m South Drill Bay - 426,529E/6,258,018N - 210 Azimuth
VU-679 -2/210 61.90 64.60 2.70 14.55 16.33
incl 62.90 63.40 0.50 57.60 56.50
100.00 101.00 1.00 13.65 12.50
VU-684 -10/210 65.00 66.00 1.00 18.25 9.20
VU-689 -18/210 81.73 82.23 0.50 10.40 17.50
120.00 121.00 1.00 9.52 13.50
VU-693 -25/210 82.00 83.00 1.00 7.65 4.00
114.00 115.00 1.00 14.70 9.40
VU-697 -33/210 14.50 15.00 0.50 9.05 10.10
1260 m South Drill Bay - 426,529E/6,258,018N - 220 Azimuth
VU-701 -26/220 97.75 98.25 0.50 9.53 13.40
VU-709 -18/220 79.00 80.00 1.00 14.25 13.40
137.00 137.50 0.50 10.25 14.40
VU-716 -10/220 70.00 75.00 5.00 6.17 15.16
incl 71.20 71.70 0.50 46.10 73.20
128.00 129.00 1.00 6.64 7.70
1270 m Drill Bay - 426,663E/6,258,075N - 157 Azimuth
VU-717 -26/157 117.02 122.00 4.98 11.56 6.68
incl 119.42 119.92 0.50 101.50 38.20
182.00 183.00 1.00 27.00 11.10
VU-720 -20/157 152.00 166.00 14.00 27.61 40.61 1 sample cut
or 152.00 166.00 14.00 39.65 40.61 uncut
incl 152.00 153.00 1.00 18.40 29.40
incl 158.22 158.72 0.50 131.00 76.00
incl 161.32 161.82 0.50 877.00 756.00
VU-722 -14/157 67.40 67.90 0.50 57.70 27.50
165.00 181.00 16.00 17.74 671.85 1 sample cut
or 165.00 181.00 16.00 1,160.77 671.85 uncut
incl 165.64 166.14 0.50 37,117.00 21,301
VU-726 -8/157 149.00 164.05 15.05 15.85 11.77
incl 150.06 150.56 0.50 455.00 226.00
VU-730 -2/157 118.00 136.71 18.71 6.01 14.73
incl 119.13 119.63 0.50 41.70 46.50
incl 122.09 122.59 0.50 35.30 22.00
incl 134.27 134.77 0.50 28.60 11.30
incl 134.77 135.30 0.53 22.90 24.20
175.08 175.58 0.50 42.00 76.40
VU-738 20/157 55.00 56.00 1.00 5.78 8.6
VU-739 35/157 91.00 97.00 6.00 9.82 36.65
incl 94.70 95.20 0.50 96.60 96.00
1350 m Drill Bay - 426,706E/6,258,050N - 122 Azimuth
VU-715 -10.5/122 135.31 158.60 23.29 12.59 34.52 1 sample cut
or 135.31 158.60 23.29 46.08 34.52 uncut
incl 143.76 144.26 0.50 2,100.00 1,190
VU-719 -1/122 138.35 142.50 4.15 49.98 49.17
incl 138.35 138.85 0.50 258.00 256.00
incl 138.85 139.35 0.50 87.80 41.90
incl 139.35 139.85 0.50 24.60 25.40
incl 140.35 140.85 0.50 25.90 23.50
VU-725 18/122 118.71 119.21 0.50 15.95 18.30
VU-731 8.5/122 72.00 80.00 8.00 17.44 26.46
incl 73.85 74.35 0.50 232.00 204.00
incl 75.35 75.85 0.50 29.10 66.30
1260 m South Drill Bay - 426,529E/6,258,018N - 225 Azimuth
VU-721 -10/225 71.18 71.68 0.50 13.40 10.30
144.00 145.00 1.00 13.75 5.80
VU-724 -22/225 94.49 94.99 0.50 96.80 81.10
(1) True thickness to be determined.
(2) Unless otherwise indicated as uncut, all gold assays over 540 g/t were cut to 540 g/t.
(3) All samples were submitted for preparation and analysis by ALS Chemex at its facilities in Terrace, B.C. All samples were analyzed using multi-digestion with ICP finish and fire assay with AA finish for gold. Samples over 100 ppm silver were reanalyzed using four acid digestion with an ore grade AA finish. Samples over 1,500 ppm silver were fire assayed with a gravimetric finish. Samples with over 10 ppm gold were fire assayed with a gravimetric finish. One in 20 samples was blank, one in 20 was a standard sample, and one in 20 samples had a sample cut from assay rejects assayed as a field duplicate at ALS Chemex in North Vancouver, B.C. Whole core (core not split) is being assayed as part of the underground infill drill program.

Kenneth C. McNaughton, M.A.Sc., P.Eng., Chief Exploration Officer, Pretium Resources Inc. is the Qualified Person (QP) responsible for the Brucejack Project exploration program.

Source: http://www.pretivm.com/

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.