Avrupa Minerals Ltd. is pleased to report the assay results from the final five 2016 drill holes in the Gossan Extension Zone at the Slivovo Gold project in Kosovo. These new assays, along with those from the previously-reported eleven drill holes (NR #14, August 16, 2016), will be used to prepare an updated resource estimate during the fall of 2016. It is significant that the gold mineralization in the Gossan Extension Zone has been discovered below the bottom thrust fault control which previously had been understood as the lower limit for gold mineralization in the Main Gossan Zone. Three holes cut gold mineralization below the thrust fault with intercepts at grades up to 5.98 g/t over 15 meters. While the data from these holes may not be enough to calculate a resource for this area, the new information does show that the mineralization continues to the east and is open down dip.

Following is a table with gold and silver results from the recent development drilling:

Gossan Extension drilling 2016 - SLV057 through SLV061
Drillhole ID From
(m)
To
(m)
Total
(m)
Au
(g/t)
Ag
(g/t)
Notes
SLV057 51 77 26 1.29 7.2 Gossan Extension Zone
in a wider zone 37 90 53 0.85 9.5
SLV058 120 123 3 38.7 33.9 Lower plate mineralization in the Gossan Extension Zone close to DHIP001
134 156.6 22.6 3.29 9.7
incl. 134 142 8 5.96 8.0
and 147 156.6 9.6 2.51 13.3
SLV059 No significant results Drilled outside of Gossan Extension Zone
SLV060 38 41 3 1.54 9.6 Upper plate - in hornblende porphyry
136 151 15 0.64 8.2 Lower plate mineralization in the Gossan Extension Zone
159 161 2 4.08 6.8
173 176.55 3.55 0.98 14.2
182 205 23 4.37 7.2
incl. 198 205 7 8.72 9.1
208.5 210.85 2.35 0.85 16.4 EOH - hole stops in mineralization
SLV061 42 72 30 1.32 11.9 Gossan Extension Zone

Table 1. Gold and silver results for final five diamond drill holes in the 2016 PFS drilling program. Infill/development drilling was designed to confirm continuity of precious metals mineralization in the Gossan Extension Zone, as well as potentially add to the initially-defined indicated resource. Significantly, two holes, SLV058 and SLV060 intercepted gold and silver mineralization beneath the low angle thrust fault that cuts off mineralization in the Main Gossan Zone.

The following schematic SW to NE section illustrates where gold mineralization is found in the Gossan Extension Zone. The intercepts in SLV060 are actually located 40 meters to the east of DHIP001, along strike of the mineralization and down dip.

To view Figure 1, please visit the following link: http://media3.marketwire.com/docs/avu0908fig1.pdf.

The following figure defines all gold anomalism in drill holes brought to surface view. While gold is present only in amenable host rocks above the low angle reverse fault in the Main Gossan Zone, it is now clear that gold mineralization has additional possibilities in permeable host rocks below the fault in the Gossan Extension Zone, as displayed in the geophysical drill hole DHIP001 and the two new drill holes, SLV058 and SLV060. The new drilling indicates that mineralization in the Gossan Extension Zone continues for at least 90 meters to the east from the high angle fault that divides the two zones. Old drill results from SLV012 may indicate that the Gossan Extension zone continues for at least another 20+ meters in the lower plate beyond SLV060. SLV012 contained 5 meters (151 - 156 meters) @ 1.33 g/t gold and 15.6 g/t silver.

To view Figure 2, please visit the following link: http://media3.marketwire.com/docs/avu0908fig2.pdf.

The drilling program is part of the Slivovo Pre-Feasibility Study ("PFS") being performed by joint venture company Peshter Mining JSC. Peshter Mining is 75% held by Byrnecut International Limited ("BIL") and 25% by Avrupa Minerals ("Avrupa" or the "Company") through its 100%-owned subsidiary in Kosovo. BIL is funding the PFS to earn-in to 85% of Peshter Mining and has spent EUR1.5 million to date towards completion of the PFS. The PFS must be finished by April 10, 2017 according to the earn-in agreement. Concurrently, Peshter Mining is also completing requirements for a mining license application. Presently, timing for submission of the application is Q2/Q3 of 2017.

Other PFS work on the Slivovo Project continues to move ahead at a rapid pace, including investigating locations for the mine and mill, roads, water testing, pit wall testing, consulting with communities, baseline environmental testing, power source planning, etc. Our partners are preparing a budget for further PFS work in 2016 and beyond-PFS work anticipated for early 2017.

Paul W. Kuhn, President and CEO of Avrupa Minerals, commented, "The new results not only show extension to the east of the gold mineralization, but also show that gold is present in preferred host rocks beneath the thrust fault that stops mineralization in the Main Gossan Zone. Implications from this include further mineralization down plunge to the east in the Extension Zone, as well as the possibility of deeper mineralization in favorable host rocks around the Slivovo property. The fact that mineralization also appears to be spatially related to porphyritic intrusive rocks suggests further possibilities for a much larger mineralizing system."

Source: http://www.avrupaminerals.com/

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.