"In May 2015 as the commodities market was in rapid decline, Foran produced six of the better drill intersections of any exploration target in all of Canada. Foran Management believes now is the time to follow up these results and build a resource which could potentially supplement any mine development decision at McIlvenna Bay" said Patrick Soares, President and CEO of Foran Mining. He continued, "The Bigstone drill program should give Foran enough information to estimate a resource that meets 43-101 standards and after careful review of the historic work completed to date, we hope to conduct enough drilling to not only verify the grade at the Bigstone Deposit, but drill holes that may incrementally expand the size of the known deposit."
Past work by previous operators has outlined an historic copper-zinc rich mineral resource estimate for the Bigstone Deposit (Table 1). The historic mineral resource estimate outlines a vertically oriented, flattened, cylindrical shaped volcanogenic massive sulphide ("VMS") deposit, in part, drill tested between 100 and 700 vertical metres below surface.
Table 1: Bigstone Historic Mineral Resource Estimate2
2 The Bigstone historic mineral resource was estimated in 1990; Foran is not treating the historic estimate as current; a Qualified Person within the meaning of National Instrument 43-101 has not completed sufficient work to classify the historic estimate as current; additional work, including re-surveying, re-logging and drill core QA/QC would be required to verify and upgrade the historic estimate to current.
The winter 2015 program consisted of a total of six large diameter (HQ) drill holes which tested the Bigstone deposit at vertical depths of between 200 and 400m. The 2015 drill program successfully validated the historic drill results and allowed for the collection of sufficient material to complete preliminary metallurgical testwork. Subsequent Metallurgical studies completed on composite samples created from the 2015 drill holes indicated that good Cu and Zn recoveries (+90%) can be obtained from the three types of mineralization tested. See Foran's November 17, 2015 News Release for details on the Bigstone metallurgical program.
The proposed 2017 Bigstone drill program will consist of approximately 7,000-8,000 metres of drilling in 15-20 drill holes. It is envisioned that drilling will take place in June-August utilizing two drill rigs. Drilling will be completed with sufficient density to allow for the completion of a NI 43-101 compliant resource estimate for the deposit.
The Bigstone Deposit lies approximately 25 kilometres southwest of the McIlvenna Bay Deposit, which is located 65km west of Flin Flon, Manitoba. McIlvenna Bay is the 3rd largest deposit discovered in the Flin Flon district with an indicated resource of 13.9 million tonnes grading 13.2% Zn Equivalent and an inferred resource of 11.3 million tonnes grading 13.5% Zn Equivalent3. In the Flin Flon and Snow Lake districts it is typical to have a large anchor VMS deposit surrounded by a number of smaller high grade satellite deposits. Bigstone maybe one of these satellite deposits in relation to nearby McIlvenna Bay. Foran has 36,500 hectare of highly prospective exploration ground surrounding McIlvenna Bay and Bigstone, which has been underexplored to date, offering significant potential to continue to increase project resources through systematic exploration.
3On March 27, 2013, Foran announced a mineral resource estimate for McIlvenna Bay, with indicated resources of 13.9 million tonnes grading 1.96% copper equivalent or 13.2% zinc equivalent (1.28% Cu, 2.67% Zn, 0.49 g/t Au, 17 g/t Ag) and an inferred resource of 11.3 million tonnes grading 2.01% copper equivalent or 13.5% zinc equivalent (1.32% Cu, 2.97% Zn, 0.43 g/t Au, 17 g/t Ag). For additional information on McIlvenna Bay, see the Foran news release dated March 27, 2013 or the report entitled "Technical Report on the McIlvenna Bay Project, Saskatchewan, Canada" dated December 9, 2011 at www.sedar.com or www.foranmining.com.
Roger March, P.Geo., Vice-president, Project Exploration for Foran, and a qualified person within the meaning of National Instrument 43-101, has reviewed and approved the technical information in this release.