Posted in | News | Diamond

Donner Metals Reports Latest Drilling Results on Matagami Project

The executor of the Matagami project, Xstrata Canada – Xstrata Zinc Canada Division, has provided the latest information about the outcome of drilling in a 4737-sq. km area to Donner Metals.

Donner Metals is a fully vested partner with Xstrata Canada in the widespread Matagami base metal project situated at Abitibi in central Québec. This partnership covers six locations of prime stratigraphy which have yielded high-quality base metal from 1961.The results of the six drillings are as follows:

  • Isle Dieu South: Diamond drillhole OR-12-42 intersected mineralized Key Tuffite in the area which graded 1.76% zinc over 2.25 m. Underneath the Key Tuffite is an altered rhyolite sequence comprising well-developed sphalerite stringers which returned 4.96% zinc over 1 m. OR-12-42 also intersected two gold zones. The first returned 4.27 g/t gold and 5.00 g/t silver over 1 m. Mineralization was hosted within a quartz-chlorite-carbonate stockwork in extremely sericitized andesite. The second returned 4.15 g/t gold and 5.07 g/t silver over 3.05 m in a quartz-chlorite-carbonate stockwork hosted in floriated and chloritized basalt in contact with a tonalite intrusive.
  • DJV area: Drillholes DJV-12-90–92 intersected the Key Tuffite. DJV-12-90 and DJV-12-93 intersected pipe alteration that showed sulphite deposits and feltic intrusive, respectively. DJV-12-90 returned 1.82 g/t gold over 0.15 m hosted within an intermediate sericitized intrusive.
  • Galinee 14: Diamond drillhole GAL14-12-08 intersected the Key Tuffite followed by a thick sequence of chlorite talc alteration. This alteration locally contained chalcopyrite stringer mineralization. GAL14-12-09 intersected a weakly mineralized tuff unit disseminated by stringer sulphides hosted in intermediate intrusive/ volcanic rock. Diamond drillhole GAL14-07-05EXT intersected the Key Tuffite from 343.28 to 344.46 m. This interval was underlain and overlain by altered volcanic rocks that contained pipe alteration.
  • Daniel Belt: DAN-12-86 intersected graphite hosted within basalts.
  • Rivière Allard: RA-12-09 was drilled to pursue earlier evident Tuffite and to test a coincident electromagnetic and magnetic trend. It intersected a favourable andesite-rhyolite contact at 365 m.
  • PD1 area: An InfiniTEM anomaly test hole was also drilled to test stratigraphy. Diamond drillhole PD-12-45 intersected a stratigraphy of rhyolite followed by intermediate mafic and volcanic rocks. No major mineralization was encountered.

Source: http://www.donnermetals.com

Disclaimer: The views expressed here are those of the author expressed in their private capacity and do not necessarily represent the views of AZoM.com Limited T/A AZoNetwork the owner and operator of this website. This disclaimer forms part of the Terms and conditions of use of this website.

G.P. Thomas

Written by

G.P. Thomas

Gary graduated from the University of Manchester with a first-class honours degree in Geochemistry and a Masters in Earth Sciences. After working in the Australian mining industry, Gary decided to hang up his geology boots and turn his hand to writing. When he isn't developing topical and informative content, Gary can usually be found playing his beloved guitar, or watching Aston Villa FC snatch defeat from the jaws of victory.

Citations

Please use one of the following formats to cite this article in your essay, paper or report:

  • APA

    Thomas, G.P.. (2019, February 18). Donner Metals Reports Latest Drilling Results on Matagami Project. AZoMining. Retrieved on April 24, 2024 from https://www.azomining.com/News.aspx?newsID=6839.

  • MLA

    Thomas, G.P.. "Donner Metals Reports Latest Drilling Results on Matagami Project". AZoMining. 24 April 2024. <https://www.azomining.com/News.aspx?newsID=6839>.

  • Chicago

    Thomas, G.P.. "Donner Metals Reports Latest Drilling Results on Matagami Project". AZoMining. https://www.azomining.com/News.aspx?newsID=6839. (accessed April 24, 2024).

  • Harvard

    Thomas, G.P.. 2019. Donner Metals Reports Latest Drilling Results on Matagami Project. AZoMining, viewed 24 April 2024, https://www.azomining.com/News.aspx?newsID=6839.

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.