US Cobalt Provides Update on Exploration Program at Iron Creek Project

US Cobalt Inc. is pleased to provide a progress update on its 2017 exploration program at the Iron Creek cobalt project in Lemhi County, Idaho, USA.

The Company has signed a contract for exploration drilling services with Timberline Drilling, a company based in Hayden Lake, Idaho with offices in Elko, Nevada.  The contract describes a minimum footage of 30,000 feet to be drilled from surface during 2017 on the patented lode mining claims.  Timberline Drilling is experienced in the mountainous terrain of central Idaho, and employs specialized equipment and personnel with experience drilling this type of project.

This drilling campaign is designed to confirm the historic cobalt mineralization and to explore for extensions.  As previously announced, previous tonnage and grade estimates indicate that the Property contains 1,279,000 tons grading 0.59% cobalt – see the Company's news release dated September 7, 2016.

The Company's rehabilitation of the underground workings is making good progress at Adit #1.  The timbers at the portal have been removed and replaced, and the focus of work is now laying new rail into the tunnels.  When complete, the tunnels accessed from Adit #1 will be channel sampled and mapped.  The results of this work will subsequently guide drilling from surface and underground.

Three adits are present on the patented lode mining claims, providing access to an approximate combined length of 1,500 feet of tunnels.  The other two adits will be rehabilitated and explored in a manner similar to Adit #1, and the data acquired will assist in guiding drilling.  The underground workings may provide an opportunity in the future to extract a bulk sample for metallurgical purposes.

During 2017 the Company plans to conduct geophysical surveys over the known mineralized zones to identify a method that will assist in locating additional drill targets.  Extensive surface sampling in sediment, soil and outcrop is planned, along with staking programs to increase the Property size.  The Company continues with mature discussions to assemble teams of geo-technicians and geologists to map, sample, and process the core obtained from drilling.  The Company expects these teams to be on site when the rehabilitation of Adit #1 is complete.

Wayne Tisdale, CEO, states:  “The Company has made excellent progress utilizing the enormously detailed and thorough data provided by our predecessors on the Property.  We are excited to more clearly delineate this exciting story and move towards not only quantifying current workings but also examining the potential for considerable expansion.  The $5.2M we have raised in the last four months, along with the fact that we are working on private ground, will allow us to move forward quickly.  Many thanks to our loyal shareholders.”

As previously announced, the Company is treating the tonnage and grade estimates above as historical estimates.   The historical estimates do not use categories that conform to current CIM Definition Standards on Mineral Resources and Mineral Reserves as outlined in National Instrument 43-101, Standards of Disclosure for Mineral Projects ("NI 43-101") and have not been redefined to conform to current CIM Definition Standards.  They were prepared in the 1980s prior to the adoption and implementation of NI 43-101. The historical estimates are contained within a report entitled "Iron Creek Prospect, Lemhi County, Idaho (#0483) Progress Report" by Terry A Webster and Thomas K Stump for Noranda Exploration, Inc., July 1980, which report does not detail cut-off grades and metal prices used to estimate the historical mineralization and used a tonnage factor of 11 cubic feet per ton.  A qualified person has not done sufficient work to classify the historical estimates as current mineral resources and the Company is not treating the historical estimates as current mineral resources.  More work, including, but not limited to, drilling, will be required to confirm the estimates to current CIM Definition Standards.  Investors are cautioned that the historical estimates do not mean or imply that economic deposits exist on the Property.  Other than as provided for in this press release, the Company has not undertaken any independent investigation of the historical estimates or other information contained in this press release nor has it independently analyzed the results of the previous exploration work in order to verify the accuracy of the information.  The Company believes that the historical estimates and other information contained in this press release are relevant to continuing exploration on the Property because they identify significant mineralization that will be the target of the Company's exploration program.

Mr. Garry Clark, P. Geo., of Clark Exploration Consulting, is the "qualified person" as defined in NI 43-101, who has reviewed and approved the technical content in this press release.

Source: http://uscobaltinc.com/

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.