Posted in | News | Copper | Zinc

Golden Share Provides Update on Pick Lake Project

Golden Share Mining Corporation ("Golden Share" or the "Company")is pleased to hereby provide an update on its Pick Lake project ("Pick Lake").

Pick Lake was part of the Silvore Fox Minerals Corp. ("Silvore Fox") property portfolio and represents a key high grade base metal target for Golden Share. The project is located 150 km east of Thunder Bay, Ontario, Canada and is accessible by road. It consists in 28 unpatented contiguous claims totaling 58.9km² and results in the consolidation of two distinct claim blocks acquired under different terms. The central part of the project consists in an option agreement with Orebot Inc. ("Orebot") to acquire a 100% interest. Additional claims were staked directly surrounding the Orebot option and provide the project with its current shape*.

Pick Lake is located within the northern Wawa terrane in the Archean Superior Province (see Figure.1). It is hosted in the Winston Lake Greenstone Belt ("WLGB"), between the Shebandowan Greenstone Belt ("SGB") located to the west and the Manitouwadge Greenstone Belt ("MGB") to the east. All three belts are bounded to the north by the Quetico sedimentary terrane and host notable base metal past producers** :

  • SGB : Shebandowan mine, past production of 8 MT at 2.0% Ni, 1.2% Cu
  • WLGB : Winston Lake mine, past production of 3 MT at 14.1% Zn and 1.0% Cu
  • MGB : Geco mine, past production of 58 MT at 3.5% Zn and 1.9% Cu

Pick Lake historical production and resources

Golden Share's Pick Lake project is located immediately adjacent to First Quantum's Winston Lake property which hosts the past producing Winston Lake mine (see Figure.2). Golden Share's past-producing Pick Lake deposit was accessed by the Winston Lake shaft through an underground drift and mined by Inmet from 1995 to 1999 producing 172,956 t grading 9.9% Zn and 0.7% Cu. The Pick Lake deposit hosts historical resources of 598,000 t at 21.2 % Zn and 1.0% Cu***.

Pick Lake exploration potential

Golden Share's Pick Lake and First Quantum's Winston Lake deposits are hosted in a typical bimodal volcanic sequence with several historical base metal showings, notably highlighting two specific horizons. The Winston Lake horizon, host to the Winston Lake deposit, trends to the northwest and has been identified on Golden Share's project while further to the west, the Pick Lake deposit - Ciglen horizon sits in the central part of the project.

Historical geophysical and geochemical data suggest that the WLGB favorable stratigraphy hosting the Pick Lake and Winston Lake past-producers extends to the northwest in the area of Sandridge Lake. This specific sector has been poorly explored and Golden Share believes the potential of the area has not been fully unlocked.

The Company intends to further develop the Pick Lake project with detailed compilation of all historical data as well as surface follow-up to refine future potential drill targets.

* see the NI 43-101 compliant technical report filed on SEDAR on June 21st 2013.

** These three mines produced accessory precious metals and PGEs but the historical production figures of in this release present only the main base metals with rounded-off numbers and were taken from non-compliant 43-101 reports.

*** These estimates were executed prior to the introduction of National Instrument 43-101; hence they should be treated as historical data and therefore not be relied upon.

Source: http://www.goldenshare.ca/

Citations

Please use one of the following formats to cite this article in your essay, paper or report:

  • APA

    Golden Share Mining Corporation. (2019, February 17). Golden Share Provides Update on Pick Lake Project. AZoMining. Retrieved on April 25, 2024 from https://www.azomining.com/News.aspx?newsID=8623.

  • MLA

    Golden Share Mining Corporation. "Golden Share Provides Update on Pick Lake Project". AZoMining. 25 April 2024. <https://www.azomining.com/News.aspx?newsID=8623>.

  • Chicago

    Golden Share Mining Corporation. "Golden Share Provides Update on Pick Lake Project". AZoMining. https://www.azomining.com/News.aspx?newsID=8623. (accessed April 25, 2024).

  • Harvard

    Golden Share Mining Corporation. 2019. Golden Share Provides Update on Pick Lake Project. AZoMining, viewed 25 April 2024, https://www.azomining.com/News.aspx?newsID=8623.

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.