Thomson Resources has announced additional assay results of two holes from the Cuttaburra trend. The company has intersected 2.5 g/t gold over 0.5 m at the Cut A. Anomalous elements tin, tungsten and bismuth have proposed that a further exploration model may be suitable for this region.
By Joel Scanlon
8 Nov 2011
NuLegacy Gold has announced the assay results of the last six holes out of the 18 hole drilling campaign conducted at the Red Hill gold project, Nevada.
By Joel Scanlon
8 Nov 2011
Petrolympic has offered details on the 80-2V well that is situated at the Chittam Ranch property, Texas Maverick basin.
By Dr. Cameron Chai
7 Nov 2011
Pershimco Resources has reported the results of step out drill holes in order to expand the oxide gold level to the northern part and to dig the deep potential of sulphides at La Pava.
By Joel Scanlon
7 Nov 2011
Intrepid Mines has received the assay results of the eight hole drill campaign conducted at the Candrian prospect and it has validated that the third copper-gold porphyry system, which was identified at the Tujuh Bukit project, has 1.8 x 0.6 km area as a minimum.
By Joel Scanlon
5 Nov 2011
Lupaka Gold has reported the assay results of six further drill holes from the current drilling conducted at its Crucero Gold project, south Peru. It has encountered wide mineralized intercepts at the project.
By Joel Scanlon
5 Nov 2011
Freegold Ventures has reported the assay results of the last three holes from the phase I drilling conducted at the Dolphin Zone, Alaska.
Jaxon Minerals has begun the phase I exploration program at its three mineral claim blocks, optioned recently, in the Flin Flon-Snow Lake deposit, in Saskatchewan and Manitoba.
BonTerra Resources has reported the infill sampling results from the Eastern Extension property. This program included the sampling of drill holes’ preferred sections and veins that were not sampled.
Galore Resources has started the drill program at Los Gemelos and El Álamo, which are important gold prospects situated at its Dos Santos property in Mexico, and at the Camino Rojo-Mazapil trend in the Concepcion Del Oro mining district.
Decade Resources has obtained the assay results of additional four holes and portion of a fifth hole, which were drilled at the Upper Montrose zone located at the Red Cliff project, northwest British Columbia.
Sienna Gold Inc. has announced the results of recent surface sampling around, and along, the Callanquitas Structure on the Company's Igor project in Peru. The samples confirm the high grade gold and silver potential of the structure.
Sunridge Gold Corp. has announced assay results from the first sixteen drill holes of the current drilling program at the Gupo Gold Deposit, part of the Asmara Project, Eritrea.
Aurcana Corporation has reported that all permits required for the Shafter silver mine to commence production have been received.
Eagle Hill Exploration Corporation has announced the completion of the first independent gold mineral resource estimate at the Windfall Lake Property compiled in accordance with Canadian Securities Administrators National Instrument 43-101, by SRK Consulting (Canada) Inc..