Northisle Copper and Gold Inc. (TSX VENTURE:NCX) has announced that its shares will begin trading on the TSX Venture Exchange on Monday, October 24th, 2011 under the symbol "NCX".
Calibre Mining Corp. has announced the receipt of assay results for Trench PRTR11-011 excavated on the newly discovered Primavera gold-copper prospect on the Borosi Project in Northeast Nicaragua.
Viking Minerals Inc. reports that it has reviewed assay results from the Dolly Varden Claims, in Elko County, Nevada, from the first drill hole completed. This is the first hole ever to be drilled on the +3000 foot IP anomaly and was basically a "blind" discovery hole.
Sierra Madre Developments Inc. and Riverside Resources Ltd. have announced results of the recently completed drill program at the El Capitan Target, Penoles Project, Durango State, Mexico. A total of 2,220 meters of HQ core drilling was completed in 18 drill holes.
The Honourable Alassane Ouattara, President of Cote d'Ivoire, today officially opened Randgold Resources' new Tongon gold mine in the north of the country. Also at the ceremony were the Minister of Mines, Oil and Energy Adama Toungara, a number of ambassadors and senior government officials from the Cote d'Ivoire as well as Mali and the DRC, and representatives of Randgold's international and African business partners.
Atna Resources Ltd. (TSX:ATN / OTCBB:ATNAF) has reported positive results for the first half of the recently completed 2011 drill program at its Reward Gold Project, Nye County, Nevada.
Argonaut Gold Inc. (TSX:AR) is reporting that the Measured and Indicated ("M&I") gold resource at its 100% owned La Colorada Project located near Hermosillo, Mexico has increased from 605,000 M&I ounces to 1,067,000 M&I ounces.
Dia Bras Exploration has released the further assay results of the stream sediment sampling campaign, which is performed at the La Verde gold prospect located at the Batopilas property in Mexico.
IMPACT Silver has reported high-grade silver results from the Oscar project, which is situated only 2.5 km to the eastern part of its Guadalupe processing plant, central Mexico.
Abzu Gold has discovered a fresh mineralized zone at its Asafo concession, which is situated along Kibi Belt’s east boundary in Ghana. The company has identified this new zone in the drill hole ASDD08, returning 4.72 g/t gold over 20.00 m.
By Joel Scanlon
24 Oct 2011
Highvista Gold has begun the drill program at its Canasta Dorada gold project. This project is situated in the Sonoran gold belt of Mexico. The company will drill 3,000 m, totaling 30 reverse circulation (RC) holes during the phase I program.
By Joel Scanlon
22 Oct 2011
Critical Elements and Blue Note Mining have reported the results of the initial five holes, drilled during the 11-hole diamond drilling campaign at the Croinor project, Quebec.
By Joel Scanlon
22 Oct 2011
Auryx Gold has reported the assay results of 37 infill diamond drill (DD) and exploration drilling holes from the present modeled pit’s west and southwest area, located at the Otjikoto gold project, Namibia.
By Joel Scanlon
22 Oct 2011
Argentum Silver has reported the assay results from its 1053 ha Coyote project in Mexico. This project manages the previous San Miguel de la Sierra mining district.
By Joel Scanlon
22 Oct 2011
Antioquia Gold has identified a second vein system in the Guaico structure’s footwall, which is at the Cisneros project. The company is drilling continuously to outline the primary formation along the strike and to the depth at the Guaico structure.