Posted in | News | Uranium

Enexco Provides Update on Mann Lake Uranium Project

International Enexco Ltd. (the "Company" or "Enexco") is pleased to provide an update regarding diamond drilling and geophysical surveying on the Mann Lake Uranium Project in the Athabasca Basin of Saskatchewan. Eleven holes have been completed of the planned 28-hole program, with a total of 9,524 m drilled to date in 2013.

In addition, Quantec Geoscience Ltd., of Toronto has completed 39 kilometres of a planned 69 kilometre SWML TDEM survey.

Of the eleven drill holes completed, elevated radioactivity was encountered in five drill holes on the eastern and western conductive responses of the "C" conductor trend.

Drilling on the eastern conductor encountered elevated radioactivity and weak mineralization in the basement section of drill holes MN-036 and MN-039. Drill hole MN-036 encountered a hydrothermally altered basement section with a number of intervals of elevated radioactivity and weak mineralization approximately 200 metres below the sub-Athabasca unconformity with 0.19% eU3O8 over 1.3 metres from 714.0 - 715.3 metres and 0.22% eU3O8 over 0.6 metres from 718.6 - 719.2 metres. (%eU3O8 grades are not chemical assays and are based on total gamma radiometric probing). MN-039 encountered weakly elevated radioactivity at 175 metres into the basement section over a 4 metre pegmatic interval from 690.5 - 694.5 metres. Drill holes MN-040 to MN-042 encountered alteration and favorable structure in the basal sandstone and intervals of graphitic stratigraphy in the basement section but no significant radioactivity.

Drilling on the western conductor encountered weakly elevated radioactivity in MN-037 in faulted and reduced sandstone between 406.9 metres and 407.5 metres. Drill hole MN-038 encountered weakly elevated radioactivity from 664.1 - 665.0 metres in pegmatite. Drilling in the area footwall to the western conductor in MN-035 encountered an altered sandstone section and weakly elevated radioactivity immediately below the unconformity in faulted graphitic stratigraphy. Although no significant mineralization was intersected, these results are encouraging.

Drilling will continue throughout March with drilling planned to follow-up the results of the geophysical survey in the northern portion of the property. Further evaluation of drill hole locations will continue in the area between Spring Lake and the southern claim boundary.

Qualified Person

William Willoughby, Ph.D., P.E. is the Company's Qualified Person for the purposes of National Instrument 43-101 and has prepared or supervised the preparation of the disclosure of any scientific and technical information contained in this news release.

Source: http://www.enexco.ca/

Citations

Please use one of the following formats to cite this article in your essay, paper or report:

  • APA

    International Enexco Ltd.. (2019, February 18). Enexco Provides Update on Mann Lake Uranium Project. AZoMining. Retrieved on April 19, 2024 from https://www.azomining.com/News.aspx?newsID=7985.

  • MLA

    International Enexco Ltd.. "Enexco Provides Update on Mann Lake Uranium Project". AZoMining. 19 April 2024. <https://www.azomining.com/News.aspx?newsID=7985>.

  • Chicago

    International Enexco Ltd.. "Enexco Provides Update on Mann Lake Uranium Project". AZoMining. https://www.azomining.com/News.aspx?newsID=7985. (accessed April 19, 2024).

  • Harvard

    International Enexco Ltd.. 2019. Enexco Provides Update on Mann Lake Uranium Project. AZoMining, viewed 19 April 2024, https://www.azomining.com/News.aspx?newsID=7985.

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.