Northern Gold Mining has reported the assay results from 2011 exploration program conducted at Garrcon deposit. This exploration consists of 2,427 m of drilling, totaling seven diamond drill holes.
Northern Tiger Resources has received the assay results of the final nine holes drilled during the 2011 program at the 3Ace property, Southeast Yukon.
By Joel Scanlon
19 Jan 2012
Calibre Mining has released further drilling results from the Phase II delineation program conducted at its Riscos de Oro, which is an epithermal project containing silver and gold. This project is located in the Borosi Concession in northeastern Nicaragua.
Midland Exploration, along with Osisko Mining, has commenced drilling at the Casault gold property. Midland has 100% control over the Casault property, which is situated approximately 40 km towards the Detour Lake gold deposit’s eastern part.
Auriga Gold has announced the 2011 autumn drilling results from its Maverick gold project. High-grade mineralization is continuously expanded in the Puffy Lake deposit’s north portion, through drilling.
By Joel Scanlon
19 Jan 2012
Montero Mining and Exploration Limited announced the results from a grab sampling and trenching exploratory project on the Nyati target at its Wigu Hill project.
By Joel Scanlon
18 Jan 2012
Grange Resources has raised its full year production output by 15 % after the iron ore grades at Savage River mine took an upturn. The iron ore pellet producer said that the Tasmanian mine would help boost their production in 2012.
Wallbridge Mining Company Limited has signed an agreement with Lonmin Plc in which Lonmin will buy 13.2 million units of Wallbridge for $2.5 million. Each unit of the Canadian company will cost Lonmin CAD $0.19 and comprise of one common share of Wallbridge and a half common share purchase warrant.
London Mining is working on expanding the iron ore project it operates in Sierra Leone. The company hopes to load its first shipment from the Marampa mine this month.
Newmont Mining said that costs for mining gold and copper would rise this year. This will be due to higher labor and power costs in Australia. The company also said that it would expect a lower production of copper this year due to hitting low grade ores Indonesia.
By Joel Scanlon
18 Jan 2012
Lundin Mining Corporation declared that its fourth quarter copper output was up by 10%. The company produced 27,488 tonnes of copper in the final quarter of 2011.
New Dawn Mining said that it had resumed mining operations at its Turk and Angelus mine in Zimbabwe. Mining had been stopped by underground mine workers at the mine last week, but now full mining operations are on track.
By Joel Scanlon
17 Jan 2012
Australian mining companies are being asked to buy Chinese equipment as a pre-condition to exporting minerals. Contracts are said to specify that the companies buy specific, non-Australian manufactured equipment. This is being seen as an outrage by Australian manufacturers.
By Joel Scanlon
17 Jan 2012
Iamgold Corp’s fourth quarter production for 2011 of gold is down by 20%. The Toronto based company produced 253,000 attributable ounces of gold in the final quarter of last year compared to 315,000 attributable ounces of gold in the last quarter of 2010.
Argonaut Resources, a junior Australian mining firm, has criticized the South Australian government for wasting its time and money over mining and native title regulation. The criticism came after the exploration license it was given for its Torrens Joint Venture was overturned.
By Joel Scanlon
17 Jan 2012